No Poster
MovieReleased
On the Critical Path
★ 7.0 Rating•22 min•1971
Server:
Overview
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Share with Friends
Details
StatusReleased
Release DateJanuary 1, 1971
BudgetN/A
RevenueN/A
GenresDocumentary
Keywords
Similar Movies

Inside Chernobyl with Ben Fogle
2021•Movie•
7.6

Decommissioning Fukushima 2024: Roadmap on the Brink
2024•Movie
Uranium Drive-In
Uranium Drive-In
2013•Movie
U 111 Dryout Experiment
U 111 Dryout Experiment
1971•Movie
Nuclear Fuel Waste Management
Nuclear Fuel Waste Management
1979•Movie
Nuclear Fuel Waste Research: The Canadian Program
Nuclear Fuel Waste Research: The Canadian Program
1979•Movie
Douglas Point Nuclear Power Station
Douglas Point Nuclear Power Station
1968•Movie
The Power of Matter
The Power of Matter
1960•Movie•
7.0
Developing Tomorrow’s Energy
Developing Tomorrow’s Energy
1980•Movie
Reconstruction of the NRX Reactor 1970
Reconstruction of the NRX Reactor 1970
1973•Movie•
8.0
Douglas Point Nuclear Power Station: Design and Construction
Douglas Point Nuclear Power Station: Design and Construction
1969•Movie
Nuclear Power Demonstration
Nuclear Power Demonstration
1963•Movie
